Planning, design and build · Mid Glamorgan

New Home Construction in Rhondda

How are new homes built on land in Rhondda?

New home construction in Rhondda is the stage where a consented scheme becomes real homes: site set-up, groundworks, roads and drainage, building the homes and handing them over. Land to Homes manages construction on the sites it brings forward, working with contractors and suppliers, and plans each scheme around homes that can be built well and then sold or let.

Site manager in a safety helmet checking drawings on a housebuilding siteRhondda · CF42

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Planning and building around Rhondda

Rhondda (CF42) is one of the Mid Glamorgan towns we cover, about 12 miles north-east of Bridgend. Close by, our coverage also takes in Tonypandy, Aberdare and Pontypridd.

Typical work around Rhondda: sites that need a fresh planning strategy, plots where access or drainage is the sticking point and fields that need a masterplan before an application. Planning in Rhondda follows Wales’s rules: Planning Policy Wales sets national policy and the council’s Local Development Plan sets local policy.

If you have a site near Rhondda that is stuck, a short call is the best place to start.

Why work with Land to Homes in Rhondda

Conditions cleared first

Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.

Groundworks and infrastructure

Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.

From land to keys

The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.

Built to the right regulations

Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.

Planning and land rules in Rhondda

Permission in Principle is not available in Wales, so the usual first step for land near Rhondda is an outline planning application, with reserved matters to follow, or a full application. Councils allocate housing sites through their Local Development Plan, and landowners can put land forward as a candidate site when a plan is prepared or reviewed. If your land is not allocated, an option or promotion agreement lets a partner take on the cost of promoting it.

In Wales, the Building Regulations are set by the Welsh Government and differ from England's, including on energy efficiency. Sustainable drainage must be approved by the SuDS approving body before construction starts on most sites, and affordable homes funded by Welsh Government grant are usually built to the Welsh Development Quality Requirements.

Key rules in Rhondda
National planning policyPlanning Policy Wales (Edition 12) and Future Wales: the National Plan 2040, supported by Technical Advice Notes
Local planning documentLocal Development Plan (LDP)
In-principle consentOutline planning permission, with reserved matters approved later
Land registrationHM Land Registry

Common questions in Rhondda

Can you build out a site that already has planning permission?

Yes, where the scheme suits us. We can buy a site with planning permission directly, subject to survey, title and contract, or discuss a joint venture where the landowner keeps an interest. We review the permission, its conditions and any legal agreement first, because they affect what can be built and when.

What are building regulations?

Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.

What are pre-commencement conditions?

They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.

What is a new-build warranty?

A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.

Do you take on planning and building work in Rhondda?

Yes, on sites we buy, option, promote or develop in partnership in Rhondda and elsewhere in Mid Glamorgan, including Merthyr Tydfil, Maesteg and Pontypridd. We do not take on planning or building work for third parties as a consultancy.

Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys

New Home Construction elsewhere in Mid Glamorgan

Own land that could take new homes?

Start with a free, no-obligation site appraisal. On option and promotion agreements we fund the planning work and pay your reasonable legal fees.