New Home Construction in Maesteg
Once a site in Maesteg has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
Maesteg · CF34Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Sites we take on near Maesteg
In Mid Glamorgan, Maesteg lies about 8 miles north-west of Bridgend; its central postcode district is CF34. The nearest other places we cover are Briton Ferry (7 miles), Neath (7 miles) and Bridgend (8 miles).
Near Maesteg, we look at sites where the layout needs to change, plots where access or drainage is the sticking point and fields that need a masterplan before an application. As Maesteg is in Wales, applications are judged against Planning Policy Wales, and the buyer of land pays Land Transaction Tax (LTT).
Tell us about the site near Maesteg and we will explain how we would take it forward.
How we work in Maesteg
Conditions cleared first
Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.
Groundworks and infrastructure
Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.
Built to the right regulations
Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.
Mixed tenures on one site
Homes for sale, homes for rent and affordable homes can be built together, designed so that the tenures are hard to tell apart from the street.
Rules that apply in Maesteg
Selling land in Maesteg follows the same legal steps as in England: heads of terms, then exchange of contracts, which makes the deal binding, and completion. Titles are registered with HM Land Registry, but the buyer pays Land Transaction Tax to the Welsh Revenue Authority rather than Stamp Duty Land Tax. Planning obligations are usually secured through a Section 106 agreement, with the Community Infrastructure Levy charged only where the council has adopted it.
In Wales, the Building Regulations are set by the Welsh Government and differ from England's, including on energy efficiency. Sustainable drainage must be approved by the SuDS approving body before construction starts on most sites, and affordable homes funded by Welsh Government grant are usually built to the Welsh Development Quality Requirements.
| Who decides applications | The local planning authority, usually the county or county borough council (or a national park authority) |
|---|---|
| Land registration | HM Land Registry |
| How a sale becomes binding | As in England, a land sale becomes legally binding on exchange of contracts and finishes on completion, with the title registered at HM Land Registry. |
| Developer contributions | Section 106 planning obligations, plus the Community Infrastructure Levy (CIL) where the council has adopted it |
Your questions answered for Maesteg
What is a new-build warranty?
A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.
Can you build out a site that already has planning permission?
Yes, where the scheme suits us. We can buy a site with planning permission directly, subject to survey, title and contract, or discuss a joint venture where the landowner keeps an interest. We review the permission, its conditions and any legal agreement first, because they affect what can be built and when.
What are pre-commencement conditions?
They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.
What happens to the roads and sewers on a new development?
On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.
Can you manage a site in Maesteg from planning to build?
On land we take forward ourselves in Maesteg and elsewhere in Mid Glamorgan, including Merthyr Tydfil, Aberdare and Tonypandy, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys