New Home Construction in Perth
Once a site in Perth has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
Perth · PH1Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Planning and building around Perth
Perth (PH1) anchors our coverage of Perth & Kinross, which takes in 2 other places. Close by, our coverage also takes in Blairgowrie, Crieff and Glenrothes.
Near Perth, we look at sites that need a fresh planning strategy, in-principle consents that still need detailed approval and land with an expired or ageing consent. Planning in Perth follows Scotland’s rules: National Planning Framework 4 sets national policy and the council’s Local Development Plan sets local policy.
If you have a site near Perth that is stuck, a short call is the best place to start.
How we work in Perth
Energy-efficient homes
Homes are designed to meet current energy standards in each nation, which increasingly means low-carbon heating, high insulation and good airtightness.
Groundworks and infrastructure
Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.
From land to keys
The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.
Mixed tenures on one site
Homes for sale, homes for rent and affordable homes can be built together, designed so that the tenures are hard to tell apart from the street.
The Scottish system, as it applies in Perth
If you own land on the edge of Perth, its prospects in Scotland depend largely on the Local Development Plan, which allocates sites for housing, and on NPF4 policies such as those on local living, infrastructure and quality homes. An option or promotion agreement lets a partner fund the planning case while you keep ownership until a sale. With Land to Homes, your reasonable legal fees on these agreements are covered, with the amount agreed in the heads of terms.
In Scotland, construction needs a building warrant from the council before work starts and an accepted completion certificate before homes are occupied. Building standards are set by the Scottish Government, and the New Build Heat Standard generally rules out direct emissions heating such as gas boilers in new homes. New roads usually need roads construction consent from the council.
| National planning policy | National Planning Framework 4 (NPF4), which forms part of the statutory development plan |
|---|---|
| In-principle consent | Planning permission in principle (PPP), followed by approval of matters specified in conditions |
| Land transaction tax (paid by the buyer) | Land and Buildings Transaction Tax (LBTT) |
| How a sale becomes binding | Land sales are concluded through missives, formal letters exchanged between solicitors that become a binding contract once concluded, followed by settlement on the date of entry and registration in the Land Register of Scotland. |
Your questions answered for Perth
What happens to the roads and sewers on a new development?
On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.
What is a new-build warranty?
A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.
Does Land to Homes build the homes itself?
Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.
How are neighbours affected during construction?
Building work brings deliveries, noise and some disruption. Councils often require a construction management plan setting out working hours, delivery routes, parking and controls on dust and noise. We follow those requirements, keep the site tidy and secure, and make sure neighbours know who to contact if something goes wrong.
Can you manage a site in Perth from planning to build?
On land we take forward ourselves in Perth and elsewhere in Perth & Kinross, including Blairgowrie and Crieff, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys