Part of the S&K Group · Land, planning and new homesEngland · Wales · Scotland · Northern Ireland0800 088 6248
Land to Homes emblem: two house roofs over green fieldsLANDTOHOMES
Planning, design and build · Perth & Kinross

Architecture and Masterplanning in Perth

How are new homes designed and masterplanned in Perth?

Architecture and masterplanning in Perth is the design work that turns a parcel of land into a layout of homes, streets and open space that a council can approve and a builder can deliver. Land to Homes prepares capacity studies, site layouts, house types and design statements, testing each one against planning policy, access, drainage and the character of the area.

Architect’s desk with a printed residential masterplan, scale ruler and pencilPerth · PH1

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Planning and building around Perth

Perth (PH1) anchors our coverage of Perth & Kinross, which takes in 2 other places. The nearest other places we cover are Blairgowrie (14 miles), Crieff (16 miles) and Glenrothes (17 miles).

Projects we can take on around Perth include plots where access or drainage is the sticking point, land where self-build plots could suit the market and fields that need a masterplan before an application. Because Perth is in Scotland, land titles are registered with Registers of Scotland (Land Register of Scotland) and transfers attract Land and Buildings Transaction Tax (LBTT).

Tell us about the site near Perth and we will explain how we would take it forward.

What we offer in Perth

Capacity studies

We test several layouts to show what a site could realistically take, allowing for access, open space, drainage and the separation distances councils expect between homes.

Clear plans for landowners

We explain drawings in plain terms, so you can see how your land would be used, where the access runs and what land might be left over.

Buildability checked

We test every scheme for construction cost and practicality, so the consent we seek is for homes that can actually be built and then sold or let.

Design codes followed

Where a council has adopted a design code or design guide, we design to it and explain in the design statement how the scheme responds.

Rules that apply in Perth

Scottish land deals differ from the rest of the UK in a few ways: contracts are concluded by missives, consent in principle is called planning permission in principle, and developer contributions use Section 75 agreements. Land to Homes works within those rules around Perth, whether buying a suitable site directly with no onward chain, subject to survey, title and contract, or promoting it through planning with nothing to pay upfront. Planning permission is never guaranteed, so we explain the risks plainly.

In Scotland, National Planning Framework 4 sets out the qualities of successful places, and Designing Streets guides how residential streets are laid out. Building standards are approved through a building warrant from the council, and the New Build Heat Standard means new homes generally need zero direct emissions heating, such as heat pumps.

Key rules in Perth
National planning policyNational Planning Framework 4 (NPF4), which forms part of the statutory development plan
Local planning documentLocal Development Plan (LDP)
Who decides applicationsThe council as planning authority (or a national park authority in its area)
Land registrationRegisters of Scotland (Land Register of Scotland)

Architecture and Masterplanning in Perth: questions

What is a design and access statement?

It is a short report submitted with certain planning applications that explains the design principles behind a scheme and how people will get to and move around it. In England and Wales it is usually needed for major development and for some smaller schemes in sensitive areas. Scotland and Northern Ireland set their own requirements for design statements.

What is a masterplan?

A masterplan is a drawing and supporting document that shows how a larger site will be laid out: where the homes, roads, footpaths, open space and drainage go, and how the site will be built in phases. It gives the council and the community a clear picture of the scheme before detailed designs are prepared for each phase.

How do you make new homes fit in with existing streets?

We study the scale, materials, building lines and spaces of the surrounding area and design homes and streets that respond to them. On a village edge that might mean lower density and more landscaping; in a town, homes that follow the existing street pattern. Early talks with planning officers and neighbours help shape the design.

Do new housing schemes need sustainable drainage?

In most cases, yes. National and local policy usually expects new developments to manage rainwater sustainably, for example with swales, ponds and permeable paving. In Wales, most new developments need separate approval from the local SuDS approving body. We design drainage into the layout from the start, because it can take up a real share of the site.

Can you manage a site in Perth from planning to build?

On land we take forward ourselves in Perth and elsewhere in Perth & Kinross, including Crieff and Blairgowrie, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.

Read more: Architecture and Masterplanning · Guide: Planning permission explained for landowners

Architecture and Masterplanning elsewhere in Perth & Kinross

Own land that could take new homes?

Start with a free, no-obligation site appraisal. On option and promotion agreements we fund the planning work and pay your reasonable legal fees.

CallFree appraisal