New Home Construction in Strabane
Once a site in Strabane has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
Strabane · BT82Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Our work around Strabane
In County Tyrone, Strabane lies about 17 miles north of Omagh; its central postcode district is BT82. The nearest other places we cover are Derry/Londonderry (13 miles), Omagh (17 miles) and Limavady (26 miles).
Near Strabane, we look at schemes that need redesigning to work, land where self-build plots could suit the market and fields that need a masterplan before an application. Planning in Strabane follows Northern Ireland’s rules: the Strategic Planning Policy Statement sets national policy and the council’s Local Development Plan sets local policy.
If you have a site near Strabane that is stuck, a short call is the best place to start.
How we work in Strabane
From land to keys
The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.
Groundworks and infrastructure
Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.
Built to the right regulations
Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.
Energy-efficient homes
Homes are designed to meet current energy standards in each nation, which increasingly means low-carbon heating, high insulation and good airtightness.
The Northern Irish system, as it applies in Strabane
Permission in Principle, an English route, does not apply in Northern Ireland. Instead, landowners near Strabane usually seek outline or full planning permission from the council. Developer contributions are agreed under Section 76 of the Planning Act (Northern Ireland) 2011, and there is no Community Infrastructure Levy. Land to Homes can take on that process through an option or promotion agreement, or buy a suitable site directly, subject to survey, title and contract.
In Northern Ireland, the Building Regulations are made by the Department of Finance and enforced by council building control. New roads are usually built to Department for Infrastructure standards for adoption, and sewers to NI Water's requirements. Planning conditions set by the council or the Department for Infrastructure must be discharged before the relevant work starts.
| National planning policy | Strategic Planning Policy Statement (SPPS, Edition 2), applied with retained Planning Policy Statements until each council adopts its Plan Strategy |
|---|---|
| Who decides applications | The 11 district councils, with the Department for Infrastructure deciding regionally significant applications |
| In-principle consent | Outline planning permission, with reserved matters approved later |
| Land registration | Land & Property Services (Land Registry and Registry of Deeds) |
Questions about New Home Construction in Strabane
Can you build out a site that already has planning permission?
Yes, where the scheme suits us. We can buy a site with planning permission directly, subject to survey, title and contract, or discuss a joint venture where the landowner keeps an interest. We review the permission, its conditions and any legal agreement first, because they affect what can be built and when.
Does Land to Homes build the homes itself?
Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.
How are neighbours affected during construction?
Building work brings deliveries, noise and some disruption. Councils often require a construction management plan setting out working hours, delivery routes, parking and controls on dust and noise. We follow those requirements, keep the site tidy and secure, and make sure neighbours know who to contact if something goes wrong.
What are pre-commencement conditions?
They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.
Can you manage a site in Strabane from planning to build?
On land we take forward ourselves in Strabane and elsewhere in County Tyrone, including Omagh, Dungannon and Cookstown, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys