Architecture and Masterplanning in Strabane
Before land in Strabane can go for planning, someone has to show how many homes fit and how they will look. We start with a capacity study, then develop a masterplan that respects neighbours, trees, levels and drainage. The design is tested for cost and buildability at every stage, so what gets approved is something that can actually be built.
Strabane · BT82Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Our work around Strabane
Strabane sits about 17 miles north of Omagh in County Tyrone, in the BT82 postcode district. Close by, our coverage also takes in Derry/Londonderry, Omagh and Limavady.
Near Strabane, we look at sites that need a fresh planning strategy, land with an expired or ageing consent and in-principle consents that still need detailed approval. In Northern Ireland, where Strabane sits, planning decisions are made by the 11 district councils, with the Department for Infrastructure deciding regionally significant applications.
If you have a site near Strabane that is stuck, a short call is the best place to start.
Why work with Land to Homes in Strabane
Buildability checked
We test every scheme for construction cost and practicality, so the consent we seek is for homes that can actually be built and then sold or let.
Drainage and ecology built in
Sustainable drainage, biodiversity and tree retention shape the layout from the first sketch, rather than being squeezed in after the homes are placed.
Design codes followed
Where a council has adopted a design code or design guide, we design to it and explain in the design statement how the scheme responds.
House types that suit the place
Homes designed to reflect local materials, scale and character, with layouts people want to live in, rather than a standard pattern book dropped onto the site.
How the rules work in Strabane
Countryside planning policy in Northern Ireland is generally restrictive, so land inside or next to the settlement development limits around Strabane is usually the strongest prospect for new homes. Outline planning permission can establish the principle, with reserved matters approved later. A promotion agreement lets us fund that planning work, with our costs recovered from the sale proceeds only if the land sells with planning. Your reasonable legal fees are covered too, agreed in the heads of terms.
In Northern Ireland, design is assessed under the Strategic Planning Policy Statement and the council's local development plan, with Creating Places, the regional guide to residential layout, still widely used. Building regulations approval is handled by council building control, and new roads usually need to meet Department for Infrastructure standards for adoption.
| National planning policy | Strategic Planning Policy Statement (SPPS, Edition 2), applied with retained Planning Policy Statements until each council adopts its Plan Strategy |
|---|---|
| Who decides applications | The 11 district councils, with the Department for Infrastructure deciding regionally significant applications |
| In-principle consent | Outline planning permission, with reserved matters approved later |
| How a sale becomes binding | A land sale becomes legally binding when contracts signed by both parties are exchanged and finishes on completion, with the title registered in the Land Registry at Land & Property Services. |
Your questions answered for Strabane
How do you make new homes fit in with existing streets?
We study the scale, materials, building lines and spaces of the surrounding area and design homes and streets that respond to them. On a village edge that might mean lower density and more landscaping; in a town, homes that follow the existing street pattern. Early talks with planning officers and neighbours help shape the design.
Do new housing schemes need sustainable drainage?
In most cases, yes. National and local policy usually expects new developments to manage rainwater sustainably, for example with swales, ponds and permeable paving. In Wales, most new developments need separate approval from the local SuDS approving body. We design drainage into the layout from the start, because it can take up a real share of the site.
Do I need an architect for a planning application?
Not by law, but a well-designed scheme with clear drawings stands a much better chance. Larger schemes also need specialist input from landscape architects, highways engineers, drainage engineers and ecologists. Where Land to Homes promotes land, we appoint and fund the design team as part of the planning work, so the landowner does not need to.
How many homes could my land take?
It depends on the size and shape of the site, the access, the character of the area, the open space and drainage the scheme needs, and local planning policy on density. Sites of the same size can have very different capacities. A capacity study is the reliable way to answer the question, and our free site appraisal gives an indicative figure.
Can you manage a site in Strabane from planning to build?
On land we take forward ourselves in Strabane and elsewhere in County Tyrone, including Cookstown, Omagh and Dungannon, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: Architecture and Masterplanning · Guide: Planning permission explained for landowners