Architecture and Masterplanning in March
Architecture and masterplanning in March is the design work that turns a parcel of land into a layout of homes, streets and open space that a council can approve and a builder can deliver. Land to Homes prepares capacity studies, site layouts, house types and design statements, testing each one against planning policy, access, drainage and the character of the area.
March · PE15Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Our work around March
March (PE15) is one of the Cambridgeshire towns we cover, about 14 miles east of Peterborough. The nearest other places we cover are Wisbech (8 miles), Ely (13 miles) and Peterborough (14 miles). Within England, March falls in the East of England region.
Projects we can take on around March include in-principle consents that still need detailed approval, land with an expired or ageing consent and schemes that need redesigning to work. Because March is in England, land titles are registered with HM Land Registry and transfers attract Stamp Duty Land Tax (SDLT).
Tell us about the site near March and we will explain how we would take it forward.
Our approach in March
House types that suit the place
Homes designed to reflect local materials, scale and character, with layouts people want to live in, rather than a standard pattern book dropped onto the site.
Drainage and ecology built in
Sustainable drainage, biodiversity and tree retention shape the layout from the first sketch, rather than being squeezed in after the homes are placed.
Buildability checked
We test every scheme for construction cost and practicality, so the consent we seek is for homes that can actually be built and then sold or let.
Funded on promotion
Where we promote your land, the design work is part of the planning work we fund, recovered from the sale proceeds only if the land sells with planning.
Planning in March: the English rules
Land with no planning permission can still be sold. Around March, the usual routes in England are a direct sale, an option agreement or a promotion agreement, where the planning work is funded for you and the land is sold once consent is granted. Outline planning permission settles the principle, with reserved matters approved later. Section 106 obligations, the Community Infrastructure Levy where charged and biodiversity net gain all affect what a site is worth, so independent advice matters.
In England, the National Planning Policy Framework places strong weight on well-designed places, and the National Design Guide and National Model Design Code shape what councils expect. Many councils have adopted local design codes. Most applications must also deliver biodiversity net gain, which affects how much of a site is set aside for habitat.
| Local planning document | Local Plan |
|---|---|
| Land transaction tax (paid by the buyer) | Stamp Duty Land Tax (SDLT) |
| Land registration | HM Land Registry |
| Developer contributions | Section 106 planning obligations, plus the Community Infrastructure Levy (CIL) where the council charges it |
Your questions answered for March
What is a masterplan?
A masterplan is a drawing and supporting document that shows how a larger site will be laid out: where the homes, roads, footpaths, open space and drainage go, and how the site will be built in phases. It gives the council and the community a clear picture of the scheme before detailed designs are prepared for each phase.
Do new housing schemes need sustainable drainage?
In most cases, yes. National and local policy usually expects new developments to manage rainwater sustainably, for example with swales, ponds and permeable paving. In Wales, most new developments need separate approval from the local SuDS approving body. We design drainage into the layout from the start, because it can take up a real share of the site.
What is a design and access statement?
It is a short report submitted with certain planning applications that explains the design principles behind a scheme and how people will get to and move around it. In England and Wales it is usually needed for major development and for some smaller schemes in sensitive areas. Scotland and Northern Ireland set their own requirements for design statements.
What is a design code?
A design code is a set of simple, measurable design rules for an area or a site, covering matters such as building heights, materials, street widths and green space. In England, councils are encouraged to produce design codes, guided by the National Model Design Code. Wales, Scotland and Northern Ireland use design guides and placemaking policies to similar effect.
Can you manage a site in March from planning to build?
On land we take forward ourselves in March and elsewhere in Cambridgeshire, including St Neots, Huntingdon and Ely, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: Architecture and Masterplanning · Guide: Planning permission explained for landowners