Part of the S&K Group · Land, planning and new homesEngland · Wales · Scotland · Northern Ireland0800 088 6248
Land to Homes emblem: two house roofs over green fieldsLANDTOHOMES
Planning, design and build · Greater London

New Home Construction in Surbiton

How are new homes built on land in Surbiton?

New home construction in Surbiton is the stage where a consented scheme becomes real homes: site set-up, groundworks, roads and drainage, building the homes and handing them over. Land to Homes manages construction on the sites it brings forward, working with contractors and suppliers, and plans each scheme around homes that can be built well and then sold or let.

Aerial view of a housing site with plots at different build stages and a site compoundSurbiton · KT5

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Our work around Surbiton

In Greater London, Surbiton lies about 11 miles south-west of London; its central postcode district is KT5. The nearest other places we cover are New Malden (2 miles), Esher (3 miles) and Hampton (3 miles). Surbiton is part of England’s London region.

Projects we can take on around Surbiton include in-principle consents that still need detailed approval, fields that need a masterplan before an application and plots where access or drainage is the sticking point. As Surbiton is in England, applications are judged against the National Planning Policy Framework, and the buyer of land pays Stamp Duty Land Tax (SDLT).

If you have a site near Surbiton that is stuck, a short call is the best place to start.

How we work in Surbiton

Respect for neighbours

Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.

Warranty considered early

Most mortgage lenders expect a new home to carry a recognised structural warranty, so warranty provider requirements are considered from the design stage.

From land to keys

The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.

Conditions cleared first

Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.

Rules that apply in Surbiton

Land with no planning permission can still be sold. Around Surbiton, the usual routes in England are a direct sale, an option agreement or a promotion agreement, where the planning work is funded for you and the land is sold once consent is granted. Outline planning permission settles the principle, with reserved matters approved later. Section 106 obligations, the Community Infrastructure Levy where charged and biodiversity net gain all affect what a site is worth, so independent advice matters.

In England, homes are built to the Building Regulations and signed off by council building control or a registered building control approver. Higher-risk residential buildings go through the Building Safety Regulator. Energy standards are being raised through the Future Homes Standard, and most developments must also deliver the biodiversity net gain agreed at planning.

Key rules in Surbiton
Who decides applicationsThe local planning authority, usually the district, borough, city or unitary council (or a national park authority)
Land registrationHM Land Registry
How a sale becomes bindingA land sale becomes legally binding on exchange of contracts and finishes on completion, after which the buyer registers the title with HM Land Registry.
Developer contributionsSection 106 planning obligations, plus the Community Infrastructure Levy (CIL) where the council charges it

Questions about New Home Construction in Surbiton

What are building regulations?

Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.

Do new homes have to be energy efficient?

Yes. Each nation's building regulations or building standards set energy efficiency requirements for new homes, and these have been tightened over recent years. In Scotland, new homes generally need zero direct emissions heating, such as heat pumps. England and Wales are moving to higher standards through updates to their own regulations.

Does Land to Homes build the homes itself?

Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.

What are pre-commencement conditions?

They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.

Can you manage a site in Surbiton from planning to build?

On land we take forward ourselves in Surbiton and elsewhere in Greater London, including Morden, Notting Hill and Battersea, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.

Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys

Own land that could take new homes?

Start with a free, no-obligation site appraisal. On option and promotion agreements we fund the planning work and pay your reasonable legal fees.

CallFree appraisal