New Home Construction in Islington

How are new homes built on land in Islington?

Once a site in Islington has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.

Bricklayer’s gloved hands laying a red facing brick on fresh mortarIslington · N1

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Sites we take on near Islington

In Greater London, Islington lies about 2 miles north-east of London; its central postcode district is N1. Close by, our coverage also takes in Highbury, Holloway and Camden Town. Islington is part of England’s London region.

Projects we can take on around Islington include schemes that need redesigning to work, land with an expired or ageing consent and land where self-build plots could suit the market. Planning in Islington follows England’s rules: the National Planning Policy Framework sets national policy and the council’s Local Plan sets local policy.

If you have a site near Islington that is stuck, a short call is the best place to start.

How we work in Islington

Respect for neighbours

Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.

Groundworks and infrastructure

Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.

Conditions cleared first

Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.

Warranty considered early

Most mortgage lenders expect a new home to carry a recognised structural warranty, so warranty provider requirements are considered from the design stage.

The English system, as it applies in Islington

Land with no planning permission can still be sold. Around Islington, the usual routes in England are a direct sale, an option agreement or a promotion agreement, where the planning work is funded for you and the land is sold once consent is granted. Outline planning permission settles the principle, with reserved matters approved later. Section 106 obligations, the Community Infrastructure Levy where charged and biodiversity net gain all affect what a site is worth, so independent advice matters.

In England, homes are built to the Building Regulations and signed off by council building control or a registered building control approver. Higher-risk residential buildings go through the Building Safety Regulator. Energy standards are being raised through the Future Homes Standard, and most developments must also deliver the biodiversity net gain agreed at planning.

Key rules in Islington
Local planning documentLocal Plan
Who decides applicationsThe local planning authority, usually the district, borough, city or unitary council (or a national park authority)
In-principle consentOutline planning permission, with reserved matters approved later
Land transaction tax (paid by the buyer)Stamp Duty Land Tax (SDLT)

New Home Construction in Islington: questions

What are building regulations?

Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.

Does Land to Homes build the homes itself?

Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.

What are pre-commencement conditions?

They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.

Do new homes have to be energy efficient?

Yes. Each nation's building regulations or building standards set energy efficiency requirements for new homes, and these have been tightened over recent years. In Scotland, new homes generally need zero direct emissions heating, such as heat pumps. England and Wales are moving to higher standards through updates to their own regulations.

Can you manage a site in Islington from planning to build?

On land we take forward ourselves in Islington and elsewhere in Greater London, including Finchley, Sutton and Notting Hill, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.

Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys