New Home Construction in Crowborough
Once a site in Crowborough has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
Crowborough · TN6Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Planning and building around Crowborough
In East Sussex, Crowborough lies about 21 miles north-east of Brighton; its central postcode district is TN6. The nearest other places we cover are East Grinstead (9 miles), Tonbridge (10 miles) and Haywards Heath (12 miles). Crowborough is in the South East region of England.
Projects we can take on around Crowborough include land with an expired or ageing consent, plots where access or drainage is the sticking point and fields that need a masterplan before an application. Planning in Crowborough follows England’s rules: the National Planning Policy Framework sets national policy and the council’s Local Plan sets local policy.
Tell us about the site near Crowborough and we will explain how we would take it forward.
Our approach in Crowborough
Conditions cleared first
Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.
Mixed tenures on one site
Homes for sale, homes for rent and affordable homes can be built together, designed so that the tenures are hard to tell apart from the street.
Respect for neighbours
Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.
Groundworks and infrastructure
Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.
The English system, as it applies in Crowborough
Land with no planning permission can still be sold. Around Crowborough, the usual routes in England are a direct sale, an option agreement or a promotion agreement, where the planning work is funded for you and the land is sold once consent is granted. Outline planning permission settles the principle, with reserved matters approved later. Section 106 obligations, the Community Infrastructure Levy where charged and biodiversity net gain all affect what a site is worth, so independent advice matters.
In England, homes are built to the Building Regulations and signed off by council building control or a registered building control approver. Higher-risk residential buildings go through the Building Safety Regulator. Energy standards are being raised through the Future Homes Standard, and most developments must also deliver the biodiversity net gain agreed at planning.
| Local planning document | Local Plan |
|---|---|
| In-principle consent | Outline planning permission, with reserved matters approved later |
| Land registration | HM Land Registry |
| How a sale becomes binding | A land sale becomes legally binding on exchange of contracts and finishes on completion, after which the buyer registers the title with HM Land Registry. |
New Home Construction in Crowborough: questions
What are building regulations?
Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.
What happens to the roads and sewers on a new development?
On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.
Can you build out a site that already has planning permission?
Yes, where the scheme suits us. We can buy a site with planning permission directly, subject to survey, title and contract, or discuss a joint venture where the landowner keeps an interest. We review the permission, its conditions and any legal agreement first, because they affect what can be built and when.
What are pre-commencement conditions?
They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.
Can you manage a site in Crowborough from planning to build?
On land we take forward ourselves in Crowborough and elsewhere in East Sussex, including Bexhill-on-Sea, Brighton and Portslade, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys