New Home Construction in Dyfed
Once a site in Dyfed has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
DyfedFree site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Our work around Dyfed
Our Dyfed coverage takes in 5 towns and cities, centred on Llanelli and including Haverfordwest, Carmarthen and Ammanford. If your land is near a boundary, we also cover West Glamorgan, Mid Glamorgan and Powys.
Projects we can take on around Dyfed include land where self-build plots could suit the market, fields that need a masterplan before an application and sites where the layout needs to change. Because Dyfed is in Wales, land titles are registered with HM Land Registry and transfers attract Land Transaction Tax (LTT).
Tell us about the site near Dyfed and we will explain how we would take it forward.
What you get in Dyfed
From land to keys
The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.
Respect for neighbours
Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.
Conditions cleared first
Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.
Groundworks and infrastructure
Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.
How the rules work in Dyfed
Permission in Principle is not available in Wales, so the usual first step for land near Dyfed is an outline planning application, with reserved matters to follow, or a full application. Councils allocate housing sites through their Local Development Plan, and landowners can put land forward as a candidate site when a plan is prepared or reviewed. If your land is not allocated, an option or promotion agreement lets a partner take on the cost of promoting it.
In Wales, the Building Regulations are set by the Welsh Government and differ from England's, including on energy efficiency. Sustainable drainage must be approved by the SuDS approving body before construction starts on most sites, and affordable homes funded by Welsh Government grant are usually built to the Welsh Development Quality Requirements.
| National planning policy | Planning Policy Wales (Edition 12) and Future Wales: the National Plan 2040, supported by Technical Advice Notes |
|---|---|
| Local planning document | Local Development Plan (LDP) |
| Who decides applications | The local planning authority, usually the county or county borough council (or a national park authority) |
| In-principle consent | Outline planning permission, with reserved matters approved later |
| Land transaction tax (paid by the buyer) | Land Transaction Tax (LTT) |
| Land registration | HM Land Registry |
| How a sale becomes binding | As in England, a land sale becomes legally binding on exchange of contracts and finishes on completion, with the title registered at HM Land Registry. |
| Developer contributions | Section 106 planning obligations, plus the Community Infrastructure Levy (CIL) where the council has adopted it |
Your questions answered for Dyfed
How are neighbours affected during construction?
Building work brings deliveries, noise and some disruption. Councils often require a construction management plan setting out working hours, delivery routes, parking and controls on dust and noise. We follow those requirements, keep the site tidy and secure, and make sure neighbours know who to contact if something goes wrong.
Do new homes have to be energy efficient?
Yes. Each nation's building regulations or building standards set energy efficiency requirements for new homes, and these have been tightened over recent years. In Scotland, new homes generally need zero direct emissions heating, such as heat pumps. England and Wales are moving to higher standards through updates to their own regulations.
Does Land to Homes build the homes itself?
Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.
What are building regulations?
Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.
Can you manage a site in Dyfed from planning to build?
On land we take forward ourselves across Dyfed, including Llanelli, Ammanford and Carmarthen, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys