New Home Construction in Poole
Once a site in Poole has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.
Poole · BH15Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Sites we take on near Poole
Poole sits about 5 miles west of Bournemouth in Dorset, in the BH15 postcode district. The nearest other places we cover are Bournemouth (5 miles), Christchurch (9 miles) and New Milton (14 miles). Within England, Poole falls in the South West region.
Projects we can take on around Poole include schemes that need redesigning to work, in-principle consents that still need detailed approval and sites where the layout needs to change. As Poole is in England, applications are judged against the National Planning Policy Framework, and the buyer of land pays Stamp Duty Land Tax (SDLT).
Tell us about the site near Poole and we will explain how we would take it forward.
How we work in Poole
Respect for neighbours
Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.
From land to keys
The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.
Built to the right regulations
Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.
Conditions cleared first
Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.
The English system, as it applies in Poole
Land with no planning permission can still be sold. Around Poole, the usual routes in England are a direct sale, an option agreement or a promotion agreement, where the planning work is funded for you and the land is sold once consent is granted. Outline planning permission settles the principle, with reserved matters approved later. Section 106 obligations, the Community Infrastructure Levy where charged and biodiversity net gain all affect what a site is worth, so independent advice matters.
In England, homes are built to the Building Regulations and signed off by council building control or a registered building control approver. Higher-risk residential buildings go through the Building Safety Regulator. Energy standards are being raised through the Future Homes Standard, and most developments must also deliver the biodiversity net gain agreed at planning.
| Who decides applications | The local planning authority, usually the district, borough, city or unitary council (or a national park authority) |
|---|---|
| Land registration | HM Land Registry |
| How a sale becomes binding | A land sale becomes legally binding on exchange of contracts and finishes on completion, after which the buyer registers the title with HM Land Registry. |
| Developer contributions | Section 106 planning obligations, plus the Community Infrastructure Levy (CIL) where the council charges it |
Common questions in Poole
How are neighbours affected during construction?
Building work brings deliveries, noise and some disruption. Councils often require a construction management plan setting out working hours, delivery routes, parking and controls on dust and noise. We follow those requirements, keep the site tidy and secure, and make sure neighbours know who to contact if something goes wrong.
What are pre-commencement conditions?
They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.
What happens to the roads and sewers on a new development?
On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.
What is a new-build warranty?
A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.
Do you take on planning and building work in Poole?
Yes, on sites we buy, option, promote or develop in partnership in Poole and elsewhere in Dorset, including Weymouth, Bournemouth and Christchurch. We do not take on planning or building work for third parties as a consultancy.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys