New Home Construction in Bodmin

How are new homes built on land in Bodmin?

Once a site in Bodmin has planning permission and the pre-commencement conditions are cleared, building can start. We organise the groundworks, utilities and roads first, then build the homes in phases, with building control inspections at key stages. Every home is built to the building regulations or building standards that apply in the nation where the site sits.

Site manager in a safety helmet checking drawings on a housebuilding siteBodmin · PL31

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Planning and building around Bodmin

In Cornwall, Bodmin lies about 20 miles north-east of Truro; its central postcode district is PL31. The nearest other places we cover are St Austell (9 miles), Newquay (16 miles) and Launceston (20 miles). Bodmin is in the South West region of England.

Projects we can take on around Bodmin include sites where the layout needs to change, plots where access or drainage is the sticking point and sites that need a fresh planning strategy. Planning in Bodmin follows England’s rules: the National Planning Policy Framework sets national policy and the council’s Local Plan sets local policy.

If you have a site near Bodmin that is stuck, a short call is the best place to start.

What you get in Bodmin

From land to keys

The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.

Built to the right regulations

Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.

Energy-efficient homes

Homes are designed to meet current energy standards in each nation, which increasingly means low-carbon heating, high insulation and good airtightness.

Respect for neighbours

Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.

The English system, as it applies in Bodmin

Whether a field or large garden could take homes depends mostly on the council's Local Plan and national policy. Under the National Planning Policy Framework, plans define settlement boundaries, and land just outside Bodmin may still come forward if it is allocated, previously developed or meets evidenced unmet housing need. Smaller housing schemes can also use Permission in Principle, an England-only route that settles location, use and amount first. Our free appraisal explains which route suits your land.

In England, homes are built to the Building Regulations and signed off by council building control or a registered building control approver. Higher-risk residential buildings go through the Building Safety Regulator. Energy standards are being raised through the Future Homes Standard, and most developments must also deliver the biodiversity net gain agreed at planning.

Key rules in Bodmin
Local planning documentLocal Plan
Who decides applicationsThe local planning authority, usually the district, borough, city or unitary council (or a national park authority)
In-principle consentOutline planning permission, with reserved matters approved later
Land transaction tax (paid by the buyer)Stamp Duty Land Tax (SDLT)

Questions about New Home Construction in Bodmin

What are pre-commencement conditions?

They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.

Does Land to Homes build the homes itself?

Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.

What are building regulations?

Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.

What is a new-build warranty?

A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.

Do you take on planning and building work in Bodmin?

Yes, on sites we buy, option, promote or develop in partnership in Bodmin and elsewhere in Cornwall, including Falmouth, Launceston and Redruth. We do not take on planning or building work for third parties as a consultancy.

Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys

Own land that could take new homes?

Start with a free, no-obligation site appraisal. On option and promotion agreements we fund the planning work and pay your reasonable legal fees.

CallFree appraisal