Part of the S&K Group · Land, planning and new homesEngland · Wales · Scotland · Northern Ireland0800 088 6248
Land to Homes emblem: two house roofs over green fieldsLANDTOHOMES
Planning, design and build · Clwyd

New Home Construction in Colwyn Bay

How are new homes built on land in Colwyn Bay?

New home construction in Colwyn Bay is the stage where a consented scheme becomes real homes: site set-up, groundworks, roads and drainage, building the homes and handing them over. Land to Homes manages construction on the sites it brings forward, working with contractors and suppliers, and plans each scheme around homes that can be built well and then sold or let.

Aerial view of a housing site with plots at different build stages and a site compoundColwyn Bay · LL29

Free site appraisal

Tell us about your land and we will call you back. No cost, no obligation.

Prefer to talk? Call 0800 088 6248.

  • Free site appraisalNo cost, no obligation
  • Legal fees coveredReasonable fees, on options and promotion
  • Nothing to pay upfrontOn promotion: we fund planning
  • Direct purchaseSuitable sites, with or without planning
  • UK-wideEngland, Wales, Scotland and NI

Our work around Colwyn Bay

We cover Colwyn Bay as part of Clwyd. It is about 35 miles north-west of Wrexham, around postcode district LL29. The nearest other places we cover are Rhyl (10 miles), Bangor (Gwynedd) (17 miles) and Flint (25 miles).

Typical work around Colwyn Bay: sites where the layout needs to change, fields that need a masterplan before an application and plots where access or drainage is the sticking point. In Wales, where Colwyn Bay sits, planning decisions are made by the local planning authority, usually the county or county borough council (or a national park authority).

Send us the site address near Colwyn Bay and we will tell you what we think the planning route is.

What you get in Colwyn Bay

Mixed tenures on one site

Homes for sale, homes for rent and affordable homes can be built together, designed so that the tenures are hard to tell apart from the street.

Conditions cleared first

Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.

Energy-efficient homes

Homes are designed to meet current energy standards in each nation, which increasingly means low-carbon heating, high insulation and good airtightness.

Groundworks and infrastructure

Roads, sewers, drainage and services are planned and built to the standards needed for adoption by the highway authority and water company where that applies.

Planning and land rules in Colwyn Bay

Permission in Principle is not available in Wales, so the usual first step for land near Colwyn Bay is an outline planning application, with reserved matters to follow, or a full application. Councils allocate housing sites through their Local Development Plan, and landowners can put land forward as a candidate site when a plan is prepared or reviewed. If your land is not allocated, an option or promotion agreement lets a partner take on the cost of promoting it.

In Wales, the Building Regulations are set by the Welsh Government and differ from England's, including on energy efficiency. Sustainable drainage must be approved by the SuDS approving body before construction starts on most sites, and affordable homes funded by Welsh Government grant are usually built to the Welsh Development Quality Requirements.

Key rules in Colwyn Bay
National planning policyPlanning Policy Wales (Edition 12) and Future Wales: the National Plan 2040, supported by Technical Advice Notes
In-principle consentOutline planning permission, with reserved matters approved later
Land transaction tax (paid by the buyer)Land Transaction Tax (LTT)
How a sale becomes bindingAs in England, a land sale becomes legally binding on exchange of contracts and finishes on completion, with the title registered at HM Land Registry.

New Home Construction in Colwyn Bay: questions

What are pre-commencement conditions?

They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.

What are building regulations?

Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.

Does Land to Homes build the homes itself?

Land to Homes manages planning, design and construction on the sites it brings forward, and is part of the S&K Group, a construction and property group. Construction is carried out with contractors and suppliers under our management. Because we plan land with building in mind, the schemes we take to planning are designed to be delivered.

What happens to the roads and sewers on a new development?

On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.

Can you manage a site in Colwyn Bay from planning to build?

On land we take forward ourselves in Colwyn Bay and elsewhere in Clwyd, including Flint, Rhyl and Deeside, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.

Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys

New Home Construction elsewhere in Clwyd

Own land that could take new homes?

Start with a free, no-obligation site appraisal. On option and promotion agreements we fund the planning work and pay your reasonable legal fees.

CallFree appraisal