New Home Construction in Montrose
Land to Homes is part of the S&K Group, a construction and property group, so building homes in Montrose is part of how we plan land from the start. We design schemes that can be built economically, manage the build with contractors and suppliers, and deliver homes for sale, for rent and for councils and housing associations.
Montrose · DD10Free site appraisal
Tell us about your land and we will call you back. No cost, no obligation.
Prefer to talk? Call 0800 088 6248.
- Free site appraisalNo cost, no obligation
- Legal fees coveredReasonable fees, on options and promotion
- Nothing to pay upfrontOn promotion: we fund planning
- Direct purchaseSuitable sites, with or without planning
- UK-wideEngland, Wales, Scotland and NI
Sites we take on near Montrose
About 25 miles north-east of Dundee, Montrose is part of our Angus & Dundee coverage, centred on postcode district DD10. Close by, our coverage also takes in Arbroath, Forfar and Stonehaven.
Typical work around Montrose: sites where the layout needs to change, schemes that need redesigning to work and land with an expired or ageing consent. Planning in Montrose follows Scotland’s rules: National Planning Framework 4 sets national policy and the council’s Local Development Plan sets local policy.
Send us the site address near Montrose and we will tell you what we think the planning route is.
What we offer in Montrose
From land to keys
The people who buy or promote the land also plan the build, so the scheme that wins planning is one that can be delivered on site.
Built to the right regulations
Each home is built to the building regulations or building standards of its nation, with inspections at key stages of the build.
Conditions cleared first
Pre-commencement conditions, legal agreements and utility connections are dealt with before work begins, so the build starts on a sound footing.
Respect for neighbours
Site traffic, working hours, noise and dust are managed under a construction management plan where the council requires one, and neighbours know who to contact.
Planning and land rules in Montrose
Scottish land deals differ from the rest of the UK in a few ways: contracts are concluded by missives, consent in principle is called planning permission in principle, and developer contributions use Section 75 agreements. Land to Homes works within those rules around Montrose, whether buying a suitable site directly with no onward chain, subject to survey, title and contract, or promoting it through planning with nothing to pay upfront. Planning permission is never guaranteed, so we explain the risks plainly.
In Scotland, construction needs a building warrant from the council before work starts and an accepted completion certificate before homes are occupied. Building standards are set by the Scottish Government, and the New Build Heat Standard generally rules out direct emissions heating such as gas boilers in new homes. New roads usually need roads construction consent from the council.
| National planning policy | National Planning Framework 4 (NPF4), which forms part of the statutory development plan |
|---|---|
| Land transaction tax (paid by the buyer) | Land and Buildings Transaction Tax (LBTT) |
| How a sale becomes binding | Land sales are concluded through missives, formal letters exchanged between solicitors that become a binding contract once concluded, followed by settlement on the date of entry and registration in the Land Register of Scotland. |
| Developer contributions | Section 75 planning obligations, with Section 69 agreements sometimes used for simple one-off payments |
Your questions answered for Montrose
What is a new-build warranty?
A new-build warranty is an insurance-backed policy that covers certain defects in a newly built home for a set period after completion. In the early part of the cover the builder is usually responsible for putting defects right, with the warranty provider covering major structural problems later on. Most mortgage lenders require a recognised warranty or a professional consultant's certificate.
What are building regulations?
Building regulations set minimum standards for the design and construction of buildings, including structure, fire safety, energy efficiency, drainage and accessibility. England, Wales and Northern Ireland each have their own regulations, approved through building control. Scotland has building standards, and work needs a building warrant from the council before it starts and a completion certificate at the end.
What happens to the roads and sewers on a new development?
On many developments the new roads are built to the highway authority's standards and then adopted, so the council maintains them. Sewers can similarly be adopted by the water company. Where roads or open spaces are not adopted, they are usually looked after by a management company funded by residents, and buyers should check this before reserving.
What are pre-commencement conditions?
They are planning conditions that must be satisfied before any work starts on site, such as approving drainage details, materials or a construction management plan. Starting work without discharging them can put the permission at risk. We deal with them before work begins, together with any planning obligations that apply to the site.
Can you manage a site in Montrose from planning to build?
On land we take forward ourselves in Montrose and elsewhere in Angus & Dundee, including Dundee, Arbroath and Forfar, we manage planning, design and construction. Tell us about the site and we will explain how we would approach it.
Read more: New Home Construction · Guide: Buying a new-build home: what to expect from reservation to keys